Symbol of the Government of Canada

Breadcrumb

Institutional links

Canadian Equine Infectious Anemia Control Program

The current EIA program consists of two components. Under the first component, horse owners voluntarily pay to have their horses tested when they are identified by the industry (i.e. movement into shows, point of sale, etc.). Testing is conducted by private veterinary practitioners and EIA private laboratories accredited by CFIA for that function. The second component of the program is the mandatory response, for which the CFIA is responsible.

Each time an EIA positive horse is discovered, it must be reported to the CFIA and disease control measures are implemented. The premises on which a reactor is discovered is declared an infected place and all susceptible animals must test negative to be allowed to move off the property. Horses in contact with the reactor within 30 days of the sampling date are also tested. All EIA test-positive horses are retested and reactors with clinical signs are ordered destroyed. Owners of horses that are confirmed positive for EIA without clinical signs must choose whether to either keep the horse in a permanent quarantine or have it destroyed. In the later case, the CFIA orders the horse destroyed and pays compensation (maximum amount payable of $2000 per horse).

Accredited laboratories charge owners an extra $2 for each animal tested to offset the cost of the CFIA's mandatory response. While this amount may, in some years, cover the cost of compensation, it does not cover CFIA's cost in terms of manpower and operating cost. This is provided as a service to the industry.

Participation in the program is voluntary and all elements of the program have been developed in conjunction with the industry. The program is based on internationally recognized disease control standards, current knowledge of the disease, and diagnostic methods. As there is no effective treatment for EIA and no vaccine to prevent it, the disease can be successfully controlled by testing and the elimination of reactors including unapparent ones. The Coggins test is an integral part of the CFIA control program.