Check-list of Information to include on a 60-day Forward Contract
The applicant may use this check list to ensure all the information is included on the 60-day Forward Contract.
- Purchaser's name
- Purchaser's address
- Seller's name
- Seller's address
- A clear indication of the end use of the potatoes (repacking, processing, other)
- Origin of potatoes
- Volume/quantity (that is to say: weight or number of loads)
- Grade/quality
- Size (when a grade is required)
- Colour (if applicable)
- Type (that is to say: round, long)(required when for repacking)
- Variety (if applicable)
- Dated signature of purchaser
- Dated signature of seller
- Date of first shipment (minimum of 60 days after date the contract is signed)
- Purchase price
- Date of contract expiry (cannot exceed 12 months from date of first shipment)
- Notes/additional information (if applicable)